Ministry of Education

Overview

Commercial Building. Building A – 16 Floors; Building B – 5 Floors; 141,500 Sq. Ft. Tenants – 1000 people (avg).

Automated Logic

Scope of BAS Works
  • 900+ I/O points
  • Initial project –
    • Chiller Plant: 4 Air Cooled Chillers
    • Pump Package: 2 Chilled Water Pumps
    • 23 Air Handling Units
    • 2 Tempered Air Units
    • 1 Fire Pump
    • Fire Alarm System
    • Leak Detection System
    • UPS System
    • ATS
    • Main Switchboard