Overview
The bank’s main operations and training centre, 57,000 Sq. Ft. 500 people (average).
Automated Logic
Scope of BAS Works
- 1,600+ I/O points
- Initial project –
- 12 AHUs serving four floors.
- 199 VAV terminal unit controllers serve the entire building.
- Chiller Plant
- Generator
- Fire System
- Potable Water System
- Power Meters – Third Party
- 1 no. WebCTRL server installed for all systems